Method

Maturity and evidence.

How the lab states how far a system has been taken, and what stands behind each number it publishes.

Maturity scale

A flagship system carries at most one maturity level. The levels are mapped to the Technology Readiness Levels used by NASA, so that a level means the same thing to readers outside the lab. A level is assigned only when a cited evidence item meets its criterion; the system page links that evidence. A system without such evidence is marked "Not assessed".

LevelTRLCriterionEvidence that meets it
Concept1–2Principles observed and the application formulated; no working system.A written design or analysis.
Prototype3–4A working system validated in the laboratory against its own tests and synthetic or recorded data.A reproduced test suite or validation run.
Validated in simulation5Validated in a relevant simulated environment against known ground truth, with a documented method.Reproduced validation against simulated or analytic ground truth.
Validated on vehicle6Demonstrated on a vehicle in a relevant environment, with logged and measured results.Measured results from logged drives, with method and conditions.
Deployed in operation7+In use in operational conditions over time.An operational record with dates and scope.
The IsoFrames maturity scale and its mapping to NASA Technology Readiness Levels (NASA, Technology Readiness Assessment Best Practices Guide, SP-20205003605, 2020).

A software release is a separate fact. A system can publish many releases at one maturity level, so desktop and library releases are shown as “Released vX.Y” next to the level, never in place of it.

Evidence

Every result the site shows is an evidence item: one measured quantity with its value, unit, conditions, method, source, commit, date, hardware and the exact command that reproduces it. Two kinds are distinguished.

Values are shown exactly as recorded: not rounded, averaged across unlike conditions or extrapolated. When two sources disagree, both are shown and marked. Checks that need a GPU, a vehicle, a simulator or network services are listed as requiring hardware or services rather than reported as passed.

What is withheld

Results measured on data that has not been cleared for publication are not shown until it is. Figures and recordings are reviewed for number plates, faces, locations and names of companies, vehicles and suppliers before they are published, and procedural or illustrative geometry is labelled as such.